M.SENTHILKUMAR
SALEM
 February 01, 2012
Sir,
I am working in SEDCfor Helper-Cum-Meter Reader, I have complete B.E(ECE)Part-Time course in 2009, Board call for the BE/IS, How many Percentage ratio for BE (ECE) ,I am also eligible or not for the BE/IS yes or no please tell me sir immediately i am very much expected to your reply.
Thank you sir
M.SENTHILKUMAR
Salem EDC

GS REPLY:-


Sir. the seniority of the TAs are fixed based on the community rotation adopted in the government. If any specific grievance exists write to us with details. we will check up and confirm.
VAK

 Er.S.ANANDARAJAPANDIAN
 NAGAPATTINAM
January 30, 2012
my name is ANANDARAJAPANDIAN S. iam living in nagapattinam.i have completed b.e.(eee) at 2009 and  am i eligible for assistant engineer in tneb? presently iam working in M/S arudra engineers pvt.ltd company...some person said to me only apprentice graduate who did  tneb only eligible for tneb direct recruitment of tneb..i request you to clarify my doubt sir,and otherwise my commuinity SC i am waiting for your reply sir
         Thanking you

GS REPLY:-


Sir, The list recommended by the employment exchange will also be considered. pl keep in touch with emp .exch.
VAK


Kathiravan R  dear sir,
my name is Kathiravan R. i living in madurai.i was did b.e.(eee) at 2008 and entered peeo at april 2009. am i eligible for assistant engineer in tneb now presently working in generator manufacturing company...some person said me only apprentice graduate who did  tneb only eligible for tneb direct recruitment of tneb..i request you to clarify my doubt sir,i am waiting for your reply sir
thanking you
Kathiravan R 


GS REPLY:-


Sir. Only those completed apprentice trg in TNEB will be considered under apprentice category. You may contact Employment exchange to check your name sponsored to TNEB for interview. Best wishes.

ranganathan/utr

04-11-2011
மின்  தடை  தவிர்க்க சில யோசனைகள் .

வணிக நிறுவனங்கள் தரமான பொருள் வழங்குவதில் ,விலை குறைவாக வழங்குவதில் ஆரோக்கியமான போட்டி காட்டலாம் .அதை விட்டுவிட்டு ஆடம்பர மின் விளக்குகள் போடுவதில் போட்டிப் போடுவது அறிவார்ந்த செயல் அன்று .தமிழகத்தின் முக்கிய நகரங்களில் எல்லாம் இந்த மின் விளக்குப் போட்டி நடக்கின்றது .இதனை ஒழிக்க வேண்டும் .

வணிக நிறுவனங்களில் குறிப்பாக  ,ஜவுளிக் கடைகள்  ,  தங்க ஆபரணக் கடைகளில்   போட்டி போட்டுக் கொண்டு கடைகளின் முன்பு மின்சார வண்ண விளக்குகளை  வாரி இரைத்து உள்ளனர் .
தேவையற்ற ஆடம்பரம் இது .மின்கட்டணம் அவர்கள் செலுத்தினாலும் மின்சாரம் விரயம் தேசிய விரயம்.

உடனடியாக ஒரு அறிவிப்பு   செய்ய வேண்டும் .
தேவையற்றவைக்கு மின்சாரம் செலவானால் தேவைக்கு இருக்காது .
ஆடம்பரத்திற்கு   மின்சாரம் செலவானால் அவசியத்திற்கு இருக்காது 
தடுப்போம் தடுப்போம் மின்சார விரயம் தடுப்போம் .
மின்சாரத்தின் அவசியத்தை உணர்த்துவோம் .

சோலார் மின்சாரம் நாட்டில் நடைமுறைப் படுத்துவோம் .
அயல்   நாடுகளில் வீடுகளில் சோலார் மின்சாரம் சேமித்து அரசாங்கத்திற்கு விற்பனை செய்கின்றனர் .
சோலார் மின்சாரம் விழிப்புணர்வு பரவலாக்கப் பட வேண்டும் .
பெரிய நிறுவனங்களின் மொட்டை மாடிகளில் சூரிய ஒளி மூலம் மின்சாரம் சேகரிக்கும் சோலார் திட்டத்தை முன்பு மழை  நீர் சேகரிப்பு திட்டம், சட்டம் போலசோலார் சேகரிப்பு கட்டாயம் ஆக்க வேண்டும் 
வீணாகப்போகும்    சூரிய ஒளி மூலம்  மின்சாரம் எடுப்போம் 
பூமி வெப்ப மயமாதலையும் தடுப்போம் . 
சுற்று சுழல் மாசு படாமல் தடுப்போம் 
மத்திய அரசிடமிருந்து மானியம் பெற்று சோலார் திட்டத்தை விரிவுப் படுத்த வேண்டும் 


எல்லா நிறுவனங்களும் முகப்புப்  பகுதியில் அளவிற்கு அதிகமாக உள்ள மின் விளக்குகளை அகற்றவேண்டும் .
குறிப்பிட்ட நாட்களுக்கு அகற்றத் தவறினால் அரசாங்கமே மின் வாரிய ஊழியர்கள் மூலம் ஆடம்பரமான தேவையற்ற விளக்குகளை அகற்ற வேண்டும்.
 
இவ்வாறு செய்தால் குடிமக்களின் அடிப்படைத் தேவைகளுக்கு மின்சாரம் தடையின்றி வழங்கலாம் .
மின் தடை ஏற்படுத்த வேண்டிய அவசியம் ஏற்படாது

ranganathan/utr
   
Er.C.RAMACHANDRAN.

CHENNAI SOUTH
August 01, 2011
To make additional income CABLE FAULT LOCATING work should be published in all dailies.At present without any advertisement cables sub-division is earning RS.TEN LAKSH per annum approximately.Please convey this to our CHAIRMAN.
S. Jeyakumar, JE / Mudis. 
9445851518

August 01, 2011
Sir,
As requested by you I am herewith submitting my suggestions to increase the boards revenue 7% to 10% in the coming months.
1.) By replacing the defective meters in the services immediately.
2.) Effecting of new services immediately without delay.
3.) By collecting the average amount with out any omission for the defective meter period in the services.
4.) periodical inspection of services to maintain correct tariffs.
5.) By collecting Levy amount as per  the electricity act 2003 for the violations noticed without omission.
6.) By revising the tariff rates only who consumes more energy.with out affecting the pupils below BPL.
7.) By collecting the long pending arrears outstanding amounts from the consumers like local body, Government arrears. etc.
8.) Replacement of old electromechanical meter in the services by electronic meters purchased  in the standard companies.
9.) By  corruption free administration.
10.) Giving employment to educated young youths this will help the board and families who get employment.
11.) In the distribution sections duplicate PR is not necessary.
12.) Application of correct tariff.
13.) By collecting CC charges in advance by giving cash discounts who pay the cc charges in advance.
14.) Sale of scrap material by action immediately it will increase the revenue and avoid theft  of materials.
15.) periodical health checkup to the employees of the board it will help smooth running of the offices.
16.) By giving tariff concession to the consumers who consumed energy in the off peak periods
17.) By maintaining uninterrupted power supply by avoiding unnecessary total shutdowns.
18.) By collecting the toll gate fee who used the board road.
19.) By giving the vacant board quarters to the govt employees who requires as on actual rental basis.
20.) By accepting the cc charges from the agricultural consumers who voluntarily remitting the cc charges.
21.) By providing e- mail facility to the section office level.
22.) By replacing the old con dammed vehicles.
23.) By giving contract to the suppliers who gives the quality products.
24.) By avoiding unnecessary meeting and conferences.
25.) By selling energy card to the particular services who purchase energy from board  in advance cash payment by giving cash discounts to the consumers.It will reduce the loan burden and interest burden of the board.

  yours faithfully,
S. Jeyakumar, JE / Mudis. 
9445851518
M.MURUGAN JE/TANGEDCO,
BS/KARUR 
August 01, 2011
sir, Board revenue increase 7% some points raised my opinion below
    1. Theft  detected wing to improve or increase vide AE IE rules, 
    2. non payment of cc charges consumers physically DC  
    3. miscellaneous charges to raise slightly Eg. ARF 50 to 100,  
    4. DCW Estimate labour charges sanctioned only 30 % instead of actual labour 
    5. all agl consumers to install the capacitor nowadays more than 90% consumers not install capacitor or                        defective. to improve this one, consume power is immediately  low 
    6. Temp. Supply consumers to fix MD recorded Energy meters including S Q and   3 Q to improve revenue
    
M.MURUGAN JE/TANGEDCO,
BS/KARUR 
Er.A.Thirumalaisamy
UDUMALAIPETTAI
August 01, 2011
Members Feed back Page is very useful to oyher members. GS Please  reply possition of ONE MAN Commission of GRADE PAY to AEE's & AE"S
            Thank U
 Er.R.KARTHIKEYAN
nagapattinam
28-07-2011
DEFECTIVE METER IDENTIFICATION AND REPLACEMENT WITH HEALTHY METER WITH OUT DELAY.

ADOPTION CORRECT TARIFF(DOMESTIC TARIFF IS ADOPTED FOR COMMERCIAL USE AND CONSTRUCTION OF COMMERCIAL BUILDING)

UNINTERRUPTED SUPPLY IN REVENUE FETCHING AREA.
CHENNAI SOUTH

 Er.R.BABU
28-07-2011
Sir,
This is my small suggestions To improve the Board revenue.
1.Ensure the Quality of "High Quality Meters."Procurement of Meters without any compromise in the quality and rate.
2.Implementation of responsibility each and every Board employee.
3.Reduction of failure of Dtrs.By providing sufficient Tr.oil for top upping DTrs.For the past three years no oil supply.Max Dtr failure occurred without oil.
4.Strengthening of staff strength in all field.
5.to avoid Outages due to line cut etc by providing quality conductor.
6.For accurate calculation of line losses,Meter should provide in each and every feeder.
7.Policy decision will be made to provide meter and materials by the consumer in case shortages and delay in procurement.
8.Incentive will be made if 100% DC to the staff like NSA etc.
9.Now very vital point is shortage of meters and materials for the revenue loss to the board.
10.Resume the MRT sections for ensuring the quality of meters.
Er.M.RAVICHANDRAN
erode

28-07-2011






1.MRT SECTION TO BE FORMED TO TEST ALL  EXISTING SERVICE METERS PERIODICALLY.
2.TO FORM A 1 NO SUBDIVISION IN EACH DIVISION TO INSPECT ALL SERVICE METERS AND TEST THIER FUNCTION PERIODICALLY AND ALSO HAVE THE POWER TO REPLACE THE DEFECTIVE METERS ITSELF IMMEADIATELY
3.TO MAINTAIN THE SUBSTATION WORKS ALL NON GRID SUBSTATION TO BE CONTROLLD BY EE OPERATION 230 KV SS.
4.OPGW (FIBRE OPTIC) TO BE PROVIDE ALL 230 KV LINES AND THE FIBRE TO BE GIVEN TO RENTAL FOR PRIVATE AGENCY/COMPANY. EXISTING IDEL AVAILABLE OPGW FIBRE TO BE USED BENIFICIALLY.
5.TO IMPROVE MAN UTILISATION PROVIDE CELL PHONE TO ALL FILED STAFFS AS CUG SCHEME.
Er.G.Sathyanarayanan

COIMBATORE

28/07/2011

Dear GS,
I request that the soft copy of MIN ALAI may be made available in our WEBSITE for reading. This way we can save the printing and posting charges and the link can be send to the engineers who registered their their mail id.
    Hot Topic is increasing the section revenue by 7%. I request Engineers to share their views and suggestions through this website. My suggestion is if email id and connectivity to the mail server for all sections is provided the cost of stationery and waste of man power in sending the particulars can be avoided. Thank U

GS REPLY:-
Dear Er. Thanks for your suggestions.
regarding revenue augmentation suggestions from sanagam was already made. How ever suggestion from viewers will be called in our web.
long Live sangam
 Er.B.Manikandan
230/110 KV SS/
Anuppankulam
Publish the TA 2009 batch seniority list in our website sir...it's very useful for all our batch friends..

GS REPLY:-



Dear Er.
 
    Action already taken to publish TA seniority list as on date including the latest internal selection batch candidates. pl wait.
BALA SHANMUGAM
balashanmugam.c@gmail.com
chennai
JULY 10, 2011

IAM WORKING IN SOUTHERN RAILWAY
My classmate Shri Shanmugam had completed D.E.E in MotiLal Nehru Govt Poltechnic pondicherry in 1980, is now working in TNEB Villupuram circle as AEE could Sangam please help me in getting his mobile number.
my mail id  is 
balashanmugam.c@gmail.com
 Er.V.Veerappan
MTPS
June 28, 2011
Dear sir,
          Website is very useful to view latest news instantly..                Long live sangam..            Which position for TA to JE 2 ele promotion...      Publish  on TA electrical seniority list...    Thanks to GS sir.
m.mahadevan,
stores supervisor/r
June 27, 2011
sir, i am watching sangams web and it is very useful to know about the latest proceedings of board
S.RAJ KUMAR FA
 Town / East / Kpt TEDC
June 27, 2011
Sir I appointed as Helper trainee( I APPOINTED AS COMPASSIONATE GROUND TYPE )  for 2years.. When i joined our TNEB Before some days i completed my Diploma course.. but aft some days first i appointed as Hr(Tr).. i finish my 2 year training period.. and then i complete my probation period.. totally i completed in 3 years  my work... actually i have doubt sir, whose is completed diploma that person was appoint as TECHNICAL ASSISTANT--(VARISU VELAI ADIPPADAIYIL) DIRECTLY.. but my appointment is varying...  What is true??? please give me above sub details... i am waiting for your reply sir.. Thank  you sir                    By yours obediently  S.RAJ KUMAR- Field Assistant..
Er.v.vijayaraghavan
THIRUVANNAMALAI
June 21, 2011
Sir,

 Can I know in what stage of promotions of je 2 to je I
Er.senthilkumar
MTPS
June 21, 2011
Dear sir
        Website is very useful to learn board activites immediatly...
    Plz publish on TA 2009 batch seniority list plz sir...
   Our TNEBES are very energetic compare to others, thanks to our GS sir...
  Which position for promotion on ta to  je/2 ele...
Er.krishnamoorthy
NAGAPATTINAM
 June 18, 2011


I think it is not necessary to insist field verification while register agriculture application since it takes several years to given service connection.The methods we are adopted given lot of hardship to the applicant and also engineers. kindly consider and do the needfull.Thanking you.


GS REPLY:-
Dear Krishnamoorthy. thanks for your opinion.we take note of it. If you have any idea on this point or on any other points, please send it thro mail/letter .we will take necessary action.
thank you
Yrs fraternally
VAK
GS

Er.R.SEETHARAMAN.
 March 19, 2011
CHENNAI SOUTH
kindly take an early steps to j.e.i grade to aee(ni)elecl.,since most of us are at retirement stage.
GS REPLY:

Dear Er.already represented. Bd called vacancy position from the field for calling particulars for the panel.
VAK
GS
Er.N.RAJA SEKAR
CHENNAI CENTRAL
 March 02, 2011
publish 2009 batch T.A seniority list

WEBSITE IS VERY USEFUL TO VIEW LATEST NEWS INSTANTLY LONG LIVE SANGAM

K.GURUSWAMY/GCM/MTPS
February 26, 2011
DEAR SIR,
         FEBRUARY 2011 "MIN ALAI"
         ------------------------ DISPLAY OF THE "GATE MEETING"PHOTOS ARE VERY CLEAR.PRINTING OF THE TEXT MATTERS ALSO VERY FINE.KEEP IT UP.I SOLUTE ALL OUR MEMBERS FEELINGS, THOSE WERE PARTICIPATING IN THE "GATE MEETING" ON 04-02-2011 WITH THEIR BRANCHES.
             THANK YOU,
                                BY
                     K.GURUSWAMY/GCM/MTPS

 Er.P.Marimuthu JE/civil
 PUDUKOTTAI
December 17, 2010
 Please take attantion to 14 years service copleted JE / Civil I gr. to get the AEE/CIVIL (NI)
GS REPLY:

Dear Er. JE I grade/ civil details are available.
Pl wait for the process
VAK
Er.P.SUNDAR
PERAMBALUR
December 05, 2010
thanks for updating all the datas and present position time to time. Is there any chance for getting the payment through bank as in other concerns.
P.Sundar AEE/Shift/Perambalur.

GS REPLY:

Dear Er. Payment  through  cheque is in practice in many circles of TNEB. 
Pl contact Branch Sec for further action.
 We will help you.
Yrs fraternally
VAK
GS
Er.S.ARUMUGAVEL
chennai west
dec 3, 2010
Hai, Thank u for providing IT format of 2010-2011 in our web. and also updating.
 Er.nazeem babu TA
vellore
December 03, 2010
sir first i thanks to u sir to rply all staff question. our engineer sangam web is very good  for updating all bps of tneb plz continue this service.
wat happen sir any chance to select TA second batch one of the my friend is waiting sir sir plz rply me .

GS REPLY:

Thank you. its all with your co-opn.
pl wait
Yrs fraternally
VAK
GS
 Er.p.SELVAKUMAR
CHENNAI SOUTH
December 03, 2010
can  i know  in what  stage  of  promotion of  je iigr  2   je igr   is still  pending  of  more  10  months  and  je igr   to  AEE  (  96  BATCH  )


GS REPLY:-

Dpc mtg partially completed.
we are insisting to process full list .
Yrs fraternally
VAK
GS

 Er.jayaprakash
NILGIRIS
December 03, 2010



Is there any possibility of next internal selection ?  Hope sangam will do needfull .


GS REPLY:-

we are representing to the Chairman. 
Pl wait 
Yrs fraternally 
VAK
 GS



Er.G.SATHYANARAYANAN
COIMBATORE
 November 14, 2010
Please arrange to compile technical instructions and to access the required instructions thro' search engine
Thank U

GS REPLY:-
-
Dear Er. Your request is noted. action will be taken.
Thank you
VAK 
GS
   
Er.M.R.PANNEERSELVAN B.E.,
 VIRUDHUNAGAR
October 08, 2010
Regarding revised Travelling Allowance DA issued vide BP 23 dated 15.07.10 , it is no way helpful for the Distribution Engineers since the ceiling limit for the O & M Ers. has not been revised in the said BP. Kindly take up this issue with Headquarters office.

Er.S.ELANGO
TTPS
 October 07, 2010
Kind request to GS, please represent to Board AE,AEE,EE New scale (GO-NEW  scale)
1) Executive Engineer 15600—39100
+6600 to
15600—39100
+7600
2) Assistant Executive
Engineer
15600—39100
+ 5400 to
15600—39100
+ 6600
3) Assistant Engineer 9300—34800
+ 4700 to
15600—39100 + 5400

GS  REPLY:-

 already represented.wait
VAK
GS
 Er.KUMARAVELU.K
COIMBATORE
October 06, 2010
 Please take necessary steps to obtained the post sanction for newly proposed lines sub division and new lines section at PALLADAM that are long pending and available at chairman's table for the fast one year.
 Er.V.Muthusamy
THIRUNELVELI
October 06, 2010
Sir,
  BP.No.38[SB]Dt.03-03-2010 is eligible to all engineers or only for o&m engineers in tirunelveli edc central office permit the bills of mm,gen,dev,c&i-section engineers but substation engineers bills are returned.get favourable orders from the head quarters.THANK YOU
 K.GURUSWAMY/GCM/MTPS
October 06, 2010
DIPLOMA HOLDERS IN T.N.E.B ARE GETTING JUNIOR ENGINEER  I GRADE PROMOTION AFTER 10 YEARS SERVICE . THIS DESIGNATION IS IDENTICALLY EQUIVALENT TO ASSISTANT ENGINEER . ASSISTANT ENGINEERS ARE GETTING ASSISTANT EXECUTIVE ENGINEER PROMOTION AFTER 6 TO 8 YEARS .BUT JUNIOR ENGINEER I GRADE ARE GETTING A.E.E PROMOTION AFTER 15 TO 20 YEARS.I THINK 3:1 RATIO IS NOT CORRECT. SUPREME COURT SAID THAT THE STATE GOVERNMENT HAS THE RIGHT TO GIVE EQUAL MERIT ON PROMOTION. PLEASE REFER MARCH-11 2O1O DAILY THANTHI NEWS PAPER . WE T.N.E.B.E.S  MAY BE REPRESENTED THIS TO OUR TAMILNADU GOVERNMENT PLEASE. OR ARRANGE FOR A.E.E NON-INDEPENDENT POST.
                    BY
               K.GURUSWAMY
                GCM/MTPS
மா.பொன்னுசாமி
தஞ்சை
September 29, 2010
அரசுத்துறையின் சம்பளமாற்றம் - வாரியத்துக்கு உண்டா ?
1) Executive Engineer 15600—39100
+6600 to
15600—39100
+7600
2) Assistant Executive
Engineer
15600—39100
+ 5400 to
15600—39100
+ 6600
3) Assistant Engineer 9300—34800
+ 4700 to
15600—39100 + 5400

  Er.Prasanna Venkatesan
  ETPS
September 29, 2010
Is there any possibilities of AE internal selection in this year?..

Hope sangam will do the needful.

GS  REPLY:-

 already represented.wait
VAK
GS
 Er G SATHYANARAYANAN
September 29, 2010
COIMBATORE
Dear Engineers,
The TNEBES Web site is updating the news and current affairs immedialtely, this is highly appreciated. Standard rent is being recovered form AEE's who are residing in SS Quarters. AEE's are eligible for free quarters as per the CE Personnel instruction during 1998. But till now the standard rent is being recovered. This may be dealt with head quarters and the problem may be set right Please.

GS REPLY:-
your point will be represented
VAK
GS
 Er.A.Manivannan.
SALEM
September 27, 2010
when will 50-100,100-120amps meter scarcity problem solved? what is the actual reason for not procuring this?in our board is there provision available to opt by consumer to switch over from nonct to ct even below sanctioned demand is below 60 kw.please explain and let clear my doubt.

noted. matter will be represented to the Board.
VAK
CHENNAI SOUTH
Er.Minsara virumbi
September 25, 2010
Kind request to GS
Already judgement copies are issued in our website, why should same thing to be printing in our Minnalai 17 pages are wasted. please be give impartant & valuable messages in future. pleas be allot a pages 1. G.S. Speech 2. current position to TNEB 3. representation to Board 4. miscellaneous etc.,,

GS  REPLY:-
Sir, The matters posted on web are not viewed by all members. 
to reach those members it is published in minalai. 
Some times it happen.
any how Tks for your msg
VAK
Er.k.pakkiri
September 22, 2010
Sir,
I need scanned copy JE I grade electrical seniority list WITHOUT TNEBES WATERMARK for pay anomoly.Please send e-mail yo me.My email is pakkirikrishnan@gmail.com.

Thank you.

pakkiri
22.09.10.
GS REPLY:-
the doc with water mark may be used no problem 
 Er.mohamed abdullah
T VELI
September 21, 2010
my father expired on 18 june 2009, i send all particulars, than my mother recived 25000 also, but still not recived my mother pension, why , we need information
plese replay as soon as possible


GS REPLY:-
ppo no 38669
we will check up and inform
VAK


 CHENNAI SOUTH
 Er.S.Venkatesan
September 20, 2010
 paied life member fee on 15.08.2007 vide recipt D 7083,venkatesan Rs.510/- but till date not issued LM NO r card . Amt paied to chennai /south Br Treasurer
GS REPLY:-
paid to central unit card will be issued shortly 
VAK
Er.Selwyn.R
September 19, 2010
 VELLORE
The up dation of forms are useful pl's put all the forms in editable mode. up lode all the left over forms.


GS REPLY:-

thanks will be done shortly
VAK
Er.S.MURUGESAN/
AE/MECH/MTPP
/STAGE-III/1x600 mw
murugujanani@yahoo.in
 September 17, 2010
SIR,I WANT TO CONTACT
ER.THIRUTHANIGAIVELAN
/JE/ELECTRICAL/Ist GR.
10 years before he was working in TTPS.(IN 1987 HE WAS WORKING IN MTPS AS TA/Gr-II)I WANT TO KNOW NOW WHERE HE IS WORKING?
Er.Abraham
DINDIGUL
September 16, 2010
Dear Mr.Ashok Kumar Sir,
On 17.04.2010 sangam has given a letter to Chairman (GS REP D DT 17 04 2010) to take urget action to fill up Technical Assistant vacant posts. Further Honourable Minister for Electricity, on 03.10.2009, at the State
Conference of Sangam announced as follows.
“ Further 1100 posts of Technical Assistants would be filled up. The list is
readily available. I will inform the Chairman / Tamil Nadu Electricity Board
to place the matter before the next Board meeting for approval and
recruitment orders for 1100 Technical Assistants will be issued.

Even after Five months of time , No action was taken.
I Kindly request you to insist Board to take immediate action.

GS REPLY
sir, we are working for the further rect of TA.
Thaks for your remeinder
yrs fraternally
VAK

Er.Nandhakumar.S
NAMAKKAL
September 14, 2010
i was completed my diploma in EEE year 2000. still now i didn't get any call letter from TNEB. what the status of post of TA. please give me a favourable reply.
 Er.D.viji
September 14, 2010
SALEM
I was completed my Diploma in EEE yaer 2001.Also completed TNEB Apperanticeship Training of year 2004.I am attented TA Interview on 08.07.2009.but i will not selected.please consider my community SCA.
 Kumar What about TA Second List


Please inform as soon as possible.
Er.S.BABU
September 10, 2010
CHENNAI NORTH
Sir,
   it is happy to see the sangam website with updated details thenthere and i  thanks for the valuable sangam members for the above work.
 Er.V.KUMAR
September 10, 2010
 MADURAI
I appriciate the concern Engineer for updating the web site then and there.Keep it well.I expect the promotion order of JE II Gr. to I Gr. very soon.
    All the Best.
 M.KOLANJINATHAN
September 10, 2010
CUDDALORE
Sir, I had completed my Diploma EEE in 2001,and i was registered my circle employment office.I didn't get any call letter from employment for tneb jobs.I want known about when i will get job from tneb.or what is the status of my district employment diploma holders list.Iam requesting the Great Engineers sangam pls Take care about as like me youngers life
Er. S. Karthikeyan
 
September 08, 2010
Sirs,
I am Karthikeyan.S. I am waiting for join in TNEB. finished my BE EEE in first class. When will the selection for engineer in TNEB. I am waiting for your response.


Thank you


Regards,
Karthikeyan S
 Er.KUMARAVELU.K
COIMBATORE
 September 08, 2010
Is there any possibility that the G.O.312 become BP?

GS REPLY(08-09-2010):- we are representing to board. pl wait.
 K.GURUSWAMY/GCM/MTPS
September 06, 2010
DEAR SIR,
         PLEASE UPDATE THE MEMBERS FEEDBACK. IT WILL SHOWS THE MEMBERS FEELING AND THEIR VIEWS AND CREATE AWARENESS.
          THANK YOU,
     K.GURUSWAMY/GCM/MTPS
VIRUDHUNAGAR 
September 02, 2010
 sir please compensatory basis job detail please sir
  Er.Ponnusamy.M
 THANJAVUR
 September 01, 2010
NO POWER IS COSTLIER THAN NO POWER"
please explain
 Er.P. SUBRAMANIYAN
THIRUVANNAMALAI
 August 30, 2010
1979 recruited diploma engineers some of
them not yet get their AEE/Electrical
promotion.Will the sangam whole heartedly
help the seniors to get the AEE Promotion.
Please kindly reply suitably.
Er.Veerakumaaran
mtps
 August 30, 2010
what about JE-2 TO JE-1 Grade Electrical
 Er.N.JOTHI
erode
August 29, 2010
Our web site is viewed by all irrespective of unions. Updating the data's in super-fast and appreciated by all.The hole credit will goes to our sangam. long live sangam. Thanks a lot RAVI.
  Dharmpuri
       Mr.Ranaganathan
August 28, 2010
dear sir ,
very good every things  update
Er.annad
chennai south

August 26, 2010
Kindly request you to please take action TA Second list
Er.CHOTO
chennai south

August 26, 2010
please give me status of TA Second lsit
saravananforu@gmail.com
August 26, 2010
Dear Sir,
Till now,I am waiting for TA 2nd list.when will the result come? Or not possible? or Infinity? Ple specify &  send to mail
 Er.rahu
thirunelveli

August 25, 2010
Sir,when ll AE    internal selection call?
 K.GURUSWAMY
 GCM/MTPS
August 20, 2010
 AUGUST-2010 MINALAI THALAIYANGAM "KARUGA THIRUVULAMO ? " IS A VERY GOOD QUESTION TO THIS SITUATION . LIBERALIZATION , PRIVATIZATION AND GLOBALIZATION LEADS OUR COUNTRY TO CREATE MORE POVERTY IN MILLIONS OF OUR PEOPLE BUT CREATE A FEW  MILLIONAIRES . CAPITALIST ONLY ACCEPT THE "LPG" POLICY . BUT THEY DIDN'T KNOW IT WILL DESTROY THE DEVOTION OF OUR NATION FROM OUR PEOPLE . I THINK IMMORAL PRACTICES IN OUR COUNTRY WERE INCREASED AFTER THE " LPG " ACTIVITIES . PRIVATE COMPANIES HAVE NO RESPONSIBILITY TO THE WELFARE OF THE CITIZEN .BUT  THE GOVERNMENT SECTORS HAVE THAT RESPONSIBILITIES. WE PROTECT OUR NATION BY WAY OF PROTECT THE GOVERNMENT SECTORS.
              THANK YOU ,
                            BY
                        K.GURUSWAMY
                          GCM/MTPS
  Er.bharathi
 
VILLUPURAM

August 17, 2010
respected sir,
TA recruitment is possible in TNEB, pls inform.
 B.EBENCE ARUL
TRICHIRAPPALLI

August 18, 2010
 working in GCC/Trichy circle and i am a Diploma HOLDER (CIVIL) i joined my duty on 30.03.1995.Still i am not getting any promotion related to my qualification.But my juniors (those who are joined after me and super most junior like (saravanakumar ,D.O.B.1984 JOINED ON 2008/AUG-Last name in je Igr suitability)
has been promoted as je ii gr and now to be promoted aS JE IGR .Why board not selected me (even 16 years service with civil diploma)and what about the future of me and others (120 diploma civil holders_).Please make arrangements for je civil post.

  Er.vikramaraghavn
  CHENGAL PATTU
August 17, 2010
please update bp/order here only upto 17-07-2010
  when jeii toje1 order comes please explain what the reasion for delay
 Er.KUMARAVELU.K
kovai

 
August 17, 2010
Please take steps to change grade pay between Foreman and Assistant Engineer.A section officer and his subordinate's grade pays are equal.Why?
 
Er.S.KARTHIKKANNAN
puthukottai

August 15, 2010
DEAR GS  SIR,

             When did assistant engineer call for.pls reply
 Er.M.AJEETH PRASATH,TA.
thiruvannamalai
 

August 13, 2010
Thanks
  Er.prabakaran
 PERAMBALUR
 August 13, 2010
dear sir, i must know about technical assistant seniorty pls send my mail id.thank you
 
 Er. A. Rajasekaran
PUDUKOTTAI
August 10, 2010
What about the selection list of J.E II gr promotions. Why late to give information.
 Er.Asok
 ERODE

 
August 07, 2010
who is the legal advisor for TNEB for BHAVANI and ERODE
 
Er.S.B.SANKARASUBRAMANIAN
 THIRUNELVELI

August 07, 2010
IN BOARD cug scheme the distribution AE GETS BENEFIT OF RS 100 PER MONTH FOR CUG BILLING.but in some of the circles i know that SUBSTATION AES ARE NOT ALLOWED TO GET THE BENEFIT.also operation circle peoples are not getting this benefit.please arrange the same in future
 
Er.s.Venkatesan
chennai south

August 06, 2010
i paid  Rs.510 on 15.08.07 for life member subs but till date not issued membership card it will get or not. my recepit no.7083/15.08.07 cennai/south br treasurer Er.PONNAMBALAVANAN sing

M.Ravi , Erode
 August 0, 2010
When released TA Yes or No. Please tell me Sir
Er. Manikandan
madurai
 August 05, 2010
Respected Sir / Madam,
         Please tell me the current status for AE recruitment I did my graduate apprenticeship by 2009 - 10 at TNEB. Any conversation or requisition going on?. Kindly response me sir.,
 Er.B.R.THANIKASALAM
 ERODE
 August 05, 2010
THANKS FOR GETTING REVISED TRAVELLING ALLOWANCE


KINDLY ARRANGE TO GET  REVISED  GRADE PAY  FOR  ASSISTANT ENGINEERS
 Er.v.muthusamy
THIRUNELVELI
 August 05, 2010
Sir if any possibilities are there to provide minalai in pdf format everymonth.
Er.G.Sathyanarayanan
COIMBATORE
03/08/10
The Website is Nice and Updation of orders and BP's Details immediately
is highly appreciated. The forms will be useful. The practice of Audit Branch is to raise the slip for rent recovery for AEE who occupies the AEE's Eligible quarters. The clarification in this regard that Territorial AEE eligible for free quarters was issued by CE/P during 1998 is available. Affected AEE's can contact me for copy of the order. Thank you.
S.Saravanan
theni
july 25 2010
When will u release TNEB TECHANICAL ASSIATANT 2nd lIST
Er.KUMARAVELU
COIMBATORE
July 24, 2010
what is the details of board discussion with unions regarding unbundling?
g.gnanagurupandian AS rtd
July 23, 2010
Sir
Please arrange to provide separate place such as forms, thanneer tnanneer for the retired employees for knowing their benefits as well as pension details,bps relating to medical assistance etc
Er.KUMARAVELU
COIMBATORE
July 18, 2010
Thank you for GETING REVISED TA AS LIKE Government staff.
Er.S.KANAGAVEL
ERODE
July 18, 2010
our web is widely seen by all irrespective of union they are in. my warm congrajulations.
K.GURUSWAMY/GCM/MTPS
july 16 2010
UN-BUNDLING SHOULD NOT AFFECT THE SENIORITY,PAY,PROMOTION,TRANSFER AND PENSION BENEFITS.IN FUTURE ANY CORPORATION OF THE T.N.E.B WON'T BE PRIVATIZED. PENSION CARPUS FUND MUST BE CREATED IMMEDIATELY.ALL THE CORPORATIONS WILL BE FUNCTIONED UNDER THE T.N.E.B.
V Prakash
July 14, 2010
venkatprakash@Hotmail.com
Can someone help me with phone number of TNEB Anna Salai Administrative office and the person who is looking after Family Pensions?

Prakash V
S/O Late K A Venkatraman (Retd as A.E in 1997 from South Arcot, Villupuram, Tittagudi, Pennadam, Sathiyavadi, Sethiathope)

REPLY BY GS/TNEBES;-       044-28520131 this is the exchange of head office. The operator will connect to pension section. call between 10.30 to 5.00
S.B.SANKARASUBRAMANIA
JULY 10, 2010

dear sir,

           i am branch treasurer of tirunelveli branch.the office bearer list of branches are not listed in our website.please do the same.thank u.

Reply by web admin www.tnebes.org :-all branch office bearers list published shortly
S.MAHUDESHWARAN
TA/SPELMTC/EEDC/ED
JULY 05 2010
       I have not received minnali book for the month of may 2010,
so please kindly be sent the book but i received this month(june)
Book
K.GURUSWAMY/GCM/MTPS
JUNE 23, 2010


 JUNE 2010 MINALAI BACKSIDE WRAPPER BACKGROUND COLOUR TO THE LYRIC AND THE FONTS ARE NOT CLEAR FOR NORMAL READING.
 ALL THE OTHERS ARE VERY GOOD ESPECIALLY
44 GENERAL COUNCIL MEETING PHOTOS.
        K.GURUSWAMY/GCM/MTPS

Chockalingam Lingam
July 08, 2010

Dear sir,

 

               I have completed diploma in mechanical engineering. my age is 22. i want details of tneb engineers sangam. can I join this? what is the use of join? what is the qualification required for joining? pls send me the detail.

 

Er.Prasanna Venkatesan
ETPS
July 08, 2010

I paid my minnalai subscription fee for one year and i didn't get any copy till date.Though i updated my address through my branch members still the same condition exist.Request to do the needfull.

 

VE.SHARAVANAN

Respected Sir,


When will u release TNEB TECHANICAL ASSIATANT 2nd lIST

K.KUMARAVELU.AE/LINES/
THUDIYALUR/CBE.17
July 08, 2010
Please arrange to issue orders for revised TA regulation that is much benifitable to all.                                             I hope sangam will do necessary steps early
 K.GURUSWAMY/GCM/MTPS
May 03, 2010
outsourcing policy reduces the quality of the work . Promotion chances of the employees will affect. Contractors and some others will get more benefit. It prevents the regular employment of the youngsters. It may leads to privatisationon of the T.N.E.B .Hence J.A.C should  protest the outsourcing policy in T.N.E.B.
 Er. Sangeetha
 COIMBATORE
23 jun 2010
Hello ! I'm looking for my teacher by name Ms.Anuradha. She is a Mechanical Engineering student from GCT Coimbatore. She had her ME degree. She took classes for us in Kancheepuram Engineering college. She is one of the few people in my life whom I would like to remember for ever.
I know from some of my friends that she is in Chennai TNEB now. I have not been able to get in touch with her though.
Er.Shankar
shankar1966@hotmail.com
I am looking for one Mr D Murali (basically from Madurai) who had joined TNEB in 1989 as AE. Can anybody tell me how to get in touch with him?
Er.KUMARAVELU.K
COIMBATORE
May 03, 2010
 Please arrange to issue orders for revised TA regulation that is much benifitable to all. I hope sangam will do necessary steps early.
                 K.KUMARAVELU.AE/LINES/THUDIYALUR/CBE.17
Er.K.GURUSWAMY
 MTPS
May 02, 2010
 I WANT TO CELEBRATE THE MAY DAY BY OUR TNEBES IN ALL BRANCHES LIKE A FESTIVAL. MOST OF THE WORKING CLASS PEOPLE AND OTHERS DOESN'T KNOW THE IMPORTANCE OF THE MAY DAY.ALMOST ALL ARE LOST THE RIGHT OF 8HRS DUTY/DAY .SOMEBODY WERE NOT WORKING
EVEN 5HRS/DAY. EDUCATING THE MEMBERS ONLY MADE THEM AS HONEST WORKER." UZHAIKKAMAL PERUM ETHUVUM URUPPADATHU" .
               THANK YOU
                 K.GURUSWAMY/GCM/MTPS
K.MOHAN KUMAR,
TA/EM-I/NCTPS.
May 01, 2010
Please publish New HBA calculation of  rate of interest for 2009-10 and 2010-2011.
Thank you,
Yours,
K.MOHAN KUMAR,
TA/EM-I/NCTPS.
G.Gnanagurupandian . A S Retd
May, 1   2010
sir
 the caption and the logo of the globe in the hands of workers is very much apriciatable at the event of may day

SSEE  OCTOBER 2009 TO APRAL 2010